1. Available in double loops or triple loops in terms of diversified requirement of cycle time.
2. Material charging is in process during mold open/close (and) ejection, which can substantially reduce the cycle time.
3. Equipped with shut-
| 价格 | 面议 |
| 发货 | China(Mainland)付款后3天内 |
| Payment Terms | L/C,D/A,D/P,T/T,Western Union,MoneyGram |
| 该产品库存不足 |
1. Available in double loops or triple loops in terms of diversified requirement of cycle time.
2. Material charging is in process during mold open/close (and) ejection, which can substantially reduce the cycle time.
3. Equipped with shut-